Interactive dashboard visualizing US flight delays and schedules, with dynamic filtering by city and year.
-
Updated
Apr 20, 2024 - Python
Interactive dashboard visualizing US flight delays and schedules, with dynamic filtering by city and year.
Supporting page for the manuscript titled "Unveiling Latency-Induced Service Degradation: A Methodological Approach with Dataset"
This project analyzes delivery performance and SLA compliance for a logistics operations dataset to identify delay patterns, SLA breach risks, and estimated cost leakage impacting business efficiency.
Auditing minimum connection time standards at U.S. hub airports using BTS On-Time Performance and DB1B data. January 2019, Python.
High-speed 8×8 Dadda multiplier designed in 45nm CMOS technology with hybrid transmission gate/CMOS logic. Features 4:2 compressor-based partial product reduction, critical path delay of 0.204ns, and comprehensive delay & power analysis.
Developed an interactive Power BI dashboard to analyze construction project performance, manpower utilization, financial metrics, and operational delays using DAX, Power Query, and data modeling.
Data-driven analysis of airline delays, cancellations, and seasonal trends.
Forensically-defensible CPM engine. AACE-canonical. Daubert-disclosed. Bit-identical JS<->Python parity.
GI/G/1 Queue Simulator with Bounded Algorithmic Numbers (BANs)
TTC subway delay analysis using Excel and Power BI to identify delay patterns by station, line, time, and weather.
Add a description, image, and links to the delay-analysis topic page so that developers can more easily learn about it.
To associate your repository with the delay-analysis topic, visit your repo's landing page and select "manage topics."