Skip to content

bump tektoncd/pipeline version 1.9.2 to fix CVE-2026-33211#2028

Closed
pratap0007 wants to merge 1 commit into
tektoncd:release-v0.35.xfrom
pratap0007:bump-pipeline
Closed

bump tektoncd/pipeline version 1.9.2 to fix CVE-2026-33211#2028
pratap0007 wants to merge 1 commit into
tektoncd:release-v0.35.xfrom
pratap0007:bump-pipeline

Conversation

@pratap0007

Copy link
Copy Markdown
Contributor

Changes

Submitter Checklist

As the author of this PR, please check off the items in this checklist:

  • Has Docs if any changes are user facing, including updates to minimum requirements e.g. Kubernetes version bumps
  • Has Tests included if any functionality added or changed
  • Follows the commit message standard
  • Meets the Tekton contributor standards (including functionality, content, code)
  • Has a kind label. You can add one by adding a comment on this PR that contains /kind <type>. Valid types are bug, cleanup, design, documentation, feature, flake, misc, question, tep
  • Release notes block below has been updated with any user facing changes (API changes, bug fixes, changes requiring upgrade notices or deprecation warnings). See some examples of good release notes.
  • Release notes contains the string "action required" if the change requires additional action from users switching to the new release

Release Notes

NONE

Signed-off-by: Shiv Verma <shverma@redhat.com>
@tekton-robot tekton-robot added the release-note-none Denotes a PR that doesnt merit a release note. label May 19, 2026
@tekton-robot
tekton-robot requested review from dibyom and khrm May 19, 2026 10:41
@tekton-robot

Copy link
Copy Markdown

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
To complete the pull request process, please assign khrm after the PR has been reviewed.
You can assign the PR to them by writing /assign @khrm in a comment when ready.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@tekton-robot tekton-robot added the size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. label May 19, 2026
@pratap0007

Copy link
Copy Markdown
Contributor Author

/retest

@khrm

khrm commented May 21, 2026

Copy link
Copy Markdown
Contributor

@pratap0007 Can you please check the CI failure?

@pratap0007

Copy link
Copy Markdown
Contributor Author

/retest

@tekton-robot tekton-robot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Jun 22, 2026
@tekton-robot

Copy link
Copy Markdown

@pratap0007: PR needs rebase.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@pratap0007 pratap0007 closed this Jun 23, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesnt merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants