Skip to content

Supported boost process v2 since Boost 1.88.0. #1567

Supported boost process v2 since Boost 1.88.0.

Supported boost process v2 since Boost 1.88.0. #1567

Triggered via pull request May 19, 2025 03:08
@redboltzredboltz
synchronize #414
process_v2
Status Failure
Total duration 24m 19s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

gha.yml

on: pull_request
Matrix: linux
Matrix: macos
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

21 errors
macos (1)
Process completed with exit code 2.
macos (3)
The operation was canceled.
macos (3)
The strategy configuration was canceled because "macos._1" failed
macos (2)
The operation was canceled.
macos (2)
The strategy configuration was canceled because "macos._1" failed
macos (0)
The operation was canceled.
macos (0)
The strategy configuration was canceled because "macos._1" failed
linux (1)
Process completed with exit code 2.
linux (4)
The operation was canceled.
linux (4)
The strategy configuration was canceled because "linux._1" failed
linux (0)
The operation was canceled.
linux (0)
The strategy configuration was canceled because "linux._1" failed
linux (3)
The operation was canceled.
linux (3)
The strategy configuration was canceled because "linux._1" failed
linux (2)
The operation was canceled.
linux (2)
The strategy configuration was canceled because "linux._1" failed
windows (1)
Process completed with exit code 1.
windows (2)
The operation was canceled.
windows (2)
The strategy configuration was canceled because "windows._1" failed
windows (0)
The operation was canceled.
windows (0)
The strategy configuration was canceled because "windows._1" failed