Skip to content

Merge branch 'release' #2162

Merge branch 'release'

Merge branch 'release' #2162

Triggered via push May 20, 2025 18:59
Status Cancelled
Total duration 5m 18s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

cli.yml

on: push
Run 'builder-docker-image.yml' workflow  /  Build base image
1m 41s
Run 'builder-docker-image.yml' workflow / Build base image
Matrix: build-cli
Run smoke tests (linux)
0s
Run smoke tests (linux)
Run Linux distros compatibility test
0s
Run Linux distros compatibility test
Check that autogenerated CLI documentation is up-to-date
0s
Check that autogenerated CLI documentation is up-to-date
Publish to GitHub Releases
0s
Publish to GitHub Releases
Publish to Docker Hub
0s
Publish to Docker Hub
Fit to window
Zoom out
Zoom in

Annotations

16 errors
Run unit tests
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Run unit tests
The operation was canceled.
Build CLI (x86_64-unknown-linux-gnu)
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Build CLI (x86_64-unknown-linux-gnu)
The operation was canceled.
Build CLI (aarch64-unknown-linux-musl)
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Build CLI (aarch64-unknown-linux-musl)
The operation was canceled.
Build CLI (x86_64-unknown-linux-musl)
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Build CLI (x86_64-unknown-linux-musl)
The operation was canceled.
Build CLI (x86_64-pc-windows-gnu)
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Build CLI (x86_64-pc-windows-gnu)
The operation was canceled.
Build CLI (aarch64-apple-darwin)
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Build CLI (aarch64-apple-darwin)
The operation was canceled.
Build CLI (x86_64-apple-darwin)
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Build CLI (x86_64-apple-darwin)
The operation was canceled.
Build CLI (aarch64-unknown-linux-gnu)
Canceling since a higher priority waiting request for 'cli-cli-branch-refs/heads/master' exists
Build CLI (aarch64-unknown-linux-gnu)
The operation was canceled.