Skip to content

Latest commit

 

History

History
17 lines (14 loc) · 1.06 KB

File metadata and controls

17 lines (14 loc) · 1.06 KB
hidden true

💿 Spin Coater V1 Build (to do)

Here is a BOM of our most recent spin coater V1 build. More info to come soon!

  • Collect all necessary measurements of the current spin-coater to create the new 3D mode.
  • Finalize an updated 3D model that includes the servo mount and any necessary adjustments to the lid design.
  • Order required components, including a servo motor, necessary mounting brackets, and plastic material for a redesigned lid.
  • Cut and prepare the new lid, ensuring proper fit and clearance for rotation
  • Assemble all components and build the initial prototype.
  • Conduct preliminary functionality tests, focusing on servo movement and integration with the claw mechanism.
  • Optimize servo rotation angles and positioning to maximize clearance while minimizing occupied space.
  • Conduct final system tests to verify smooth automation and reliable lid operation.
  • Implement necessary refinements and finalize the design for long-term use.