fix(deps): update dependency protobuf to v7 #1806
test.yml
on: pull_request
Matrix: unit-test
Matrix: integration-test
finish-coveralls
0s
Annotations
17 errors
|
unit-test (3.14)
Process completed with exit code 1.
|
|
unit-test (3.12)
The strategy configuration was canceled because "unit-test._3_14" failed
|
|
unit-test (3.12)
Process completed with exit code 1.
|
|
integration-test (8.8.0)
Process completed with exit code 1.
|
|
unit-test (3.13)
The strategy configuration was canceled because "unit-test._3_14" failed
|
|
unit-test (3.13)
Process completed with exit code 1.
|
|
integration-test (8.7.15)
The strategy configuration was canceled because "integration-test._8_8_0" failed
|
|
integration-test (8.7.15)
Process completed with exit code 1.
|
|
unit-test (3.9)
The strategy configuration was canceled because "unit-test._3_14" failed
|
|
unit-test (3.10)
The strategy configuration was canceled because "unit-test._3_14" failed
|
|
unit-test (3.10)
The operation was canceled.
|
|
unit-test (3.11)
The strategy configuration was canceled because "unit-test._3_14" failed
|
|
unit-test (3.11)
The operation was canceled.
|
|
integration-test (8.5.25)
The strategy configuration was canceled because "integration-test._8_8_0" failed
|
|
integration-test (8.5.25)
The operation was canceled.
|
|
integration-test (8.6.29)
The strategy configuration was canceled because "integration-test._8_8_0" failed
|
|
integration-test (8.6.29)
The operation was canceled.
|